40m² ca.
60m² ca.
80m² ca.
80m² ca.
Steel structure framework
Leakproof monoblock roofing
Weldless quick installation
PU painted, steel shell panels heat and cold insulated with 100mm A1 class (nonflammable) Knauf Mineral Plus (0.0037 W/mk)
Panoramic double glazing
Partition walls and doors
Kitchen, bath and room cabinets
Sanitary installations and hardwares
Instant water heater
Electrical installations and hardwares
Heating and cooling with air conditioning
Suspended ceiling
Parquet flooring
Sliding terrace doors
Covered terrace
Household appliances
Electrically operated metal roller blind
Electrically operated curtains
Screen for flies and insects
Photovoltaic solar panels
Wood siding
Grass roof top
According to designated coordinates;
Footing beams
Electrical supply line
Potable water supply line
Waste water discharge line
From factory to Europe Zone countries 7 – 10 days.
Within 24 hours, following the site preparation in sequence with transportation and a crane, to the building site.
Project consultancy for compliance with permits before assembly.